Factory planning for water bottling projects
Requirements before equipment selection
A reliable requirement set describes the product, operating conditions and factory interfaces that the selected equipment must serve. Use this page to organize inputs, not as a substitute for local design or compliance review.
Answer first
The project needs a defined product and destination, source-water evidence, approved bottles and packs, a demand-based capacity, complete process and packaging equipment, suitable rooms and material flow, stable utilities, drainage, quality controls, trained people, permits and a written installation and acceptance plan.

01
Start with the things the factory must produce and handle.
Record source type, available flow, analysis, seasonal concerns, treatment objectives, target water characteristics and sampling responsibilities.
Identify the intended product category and the destination-market rules, tests, records and label review that require local confirmation.
Provide bottle drawings or samples, material, volume, neck finish, cap, label area, pack pattern and pallet assumption.
Separate confirmed launch formats from future possibilities and show which format changes must be included in the current order.
02
Turn demand into an operating basis and then into a line scope.
| Requirement group | Questions to answer | Project deliverable |
|---|---|---|
| Capacity | Annual volume, peak factor, days, shifts, hours, changeover and target utilization? | Planning rate and operating calendar |
| Equipment | Which treatment, bottle, filling, label, pack, conveyance, inspection and pallet functions? | Equipment and option list |
| Automation | Which functions, line states, recipes, data, alarms and integrations are needed? | Control and signal description |
| Performance | Under which product, bottle, material, utility and test conditions? | Acceptance criteria and test plan |
03
The factory must supply each machine at the right point and condition.
Confirm voltage, frequency, phases, available capacity, protection, isolation, grounding and distribution responsibility.
Separate general compressed air from high-pressure blowing air and record quality, pressure, flow, storage and cooling needs.
Define raw, treated and cleaning water routes plus drain locations, expected streams and local discharge review.
Provide hygienic zoning, operator and maintenance access, equipment arrival route, storage, QC, utilities and dispatch movement.
04
Operating readiness is a deliverable, not an assumption.
Define sampling, in-process checks, laboratory needs, release, traceability, deviation handling and record ownership.
Plan operators, quality staff, maintenance, utility operation, supervision, sanitation and material replenishment by shift.
Assign engineering approval, FAT, packing, shipping, unloading, installation, commissioning, training and handover.
List layouts, diagrams, manuals, certificates supplied with equipment, parts lists, backups, records and required languages.
05
A requirement is useful only when its status and changes are visible to every project party.
Give each product, format, performance, utility, document and service requirement an owner, status and approval reference.
Record every value used before evidence is available and identify when the assumption must be confirmed or replaced.
Check the effects of a new bottle, higher capacity, different pack or site change on equipment, utilities, cost and schedule before approval.
Attach the approved requirement, format, equipment, responsibility and acceptance schedules to the signed technical agreement.
06
Collecting requirements is only the first step. Give each item a unique identifier, source, priority, verification method, responsible party and final evidence so procurement, design, FAT, installation and handover use the same basis.
| Requirement field | Purpose | Example status |
|---|---|---|
| Need and source | Explains who needs the outcome and which evidence or obligation supports it | Approved / provisional / disputed |
| Testable statement | States the required function or condition without prescribing an unsupported solution | Required / preferred / optional |
| Verification route | Assigns review, inspection, calculation, FAT, site test or operating evidence | Planned / witnessed / accepted |
| Responsibility and due date | Prevents a supplier, buyer or local input from becoming ownerless | Open / blocked / closed |
| Change and traceability | Shows affected drawings, equipment, tests, cost and schedule when the need changes | Current revision and disposition |
Buyer questions
At minimum: product, bottle and pack formats, capacity basis, water analysis, destination, voltage, site status, required equipment and requested project services.
Only preliminary allowances can be discussed. Final loads and connection requirements must come from the confirmed machines and operating conditions.
No. Source approval, product standards, facility licensing, labeling, environmental and worker-safety requirements must be verified for the actual destination.
Any unverified input. An explicit unknown is safer than a guessed value and becomes an action in the clarification register.
The checklist helps collect and prioritize project inputs. A user requirement specification converts the approved needs into controlled, testable statements with verification and traceability for procurement and acceptance.
Move this project question forward
The factory must supply each machine at the right point and condition.
Not sure which data matters? Send what you have and state the decision you need to make.
Send target capacity and SKUs, source-water report, site utility schedule, building layout and required project milestones.
The project desk can identify missing inputs and a practical next step. Final engineering, configuration, compliance and commercial terms remain project-specific.