One requirement baseline
Give every supplier the same product, bottle, cap, label, pack, capacity, site, utility and service inputs.
Factory planning for water bottling projects
Evidence before supplier preference
The strongest proposal is not automatically the lowest price or longest machine list. Compare suppliers against the same requirement set, then score only the evidence that is actually provided.
Answer first
Evaluate the evidence behind the proposed process, equipment, output basis, controls, interfaces, documents, project plan, FAT, packing, delivery, installation, commissioning, spares and support. A polished quotation or low total is not a substitute for a complete, reviewable and contract-controlled scope.

Downloadable buyer resource
Three editable Excel registers: Bid Compliance, Clarifications and Spare Parts. Start with blank project rows and use the clearly labeled examples to understand each field. No macros or automatic supplier scores.
Download buyer workbook (.xlsx)
Free download. No email address required. The workbook stays on your device; enter your project information in your own copy.
Evidence-weighted scorecard
Use 0 for no evidence and 5 for a clear, project-specific response. Weighting is a starting point; change the decision process when your project risk requires it.
Weighted evidence result
A higher score means more of the requested evidence was entered. It is not an endorsement, risk guarantee or substitute for technical, legal and financial due diligence.
01
Commercial totals are comparable only after technical and project boundaries match.
Give every supplier the same product, bottle, cap, label, pack, capacity, site, utility and service inputs.
List treatment, blowing, filling, labeling, packing, conveyors, inspection, utilities, spares and services line by line.
Require suppliers to state deviations, exclusions, alternatives and assumptions against the baseline.
Separate equipment, options, packing, freight, taxes, local work, installation and launch requirements.
02
Do not award points for adjectives that are not connected to documents, tests or identified components.
| Review area | Evidence to request | Question to settle |
|---|---|---|
| Performance | Rated conditions, format matrix, line balance and test method | Which bottle and materials support each promised output? |
| Interfaces | Layout, utility list, connection points and signal description | Who owns every adjacent machine, pipe, cable and control signal? |
| Build and components | Materials, component schedule, drawings and inspection basis | Which statements are specified and which are only marketing language? |
| Acceptance | FAT/SAT plan, duration, materials, measurements and open-item process | What evidence proves the agreed result? |
03
The equipment has to reach the site, enter the building and become maintainable operation.
Named communication route, approval schedule, document list, change procedure and shipment dependencies.
Travel, labor, tools, lifting, accommodation, local connections and safety responsibilities in writing.
Operator and maintenance topics, language, manuals, drawings, backups, parts lists and completion records.
Startup spares, recommended stock, part identification, order route and defined support channels.
04
A clarification request is cheaper than a late interface dispute.
A BPH number without bottle, product, utility, material and test conditions cannot be verified.
A broad label with no included, excluded and buyer-side schedule leaves the largest project risks unresolved.
Documents that do not reflect the quoted machines and site may not be usable for local work.
Commercial urgency should not replace specification, due diligence or contract review.
05
The scorecard supports judgment; it does not replace reference checks, inspection or a signed technical agreement.
| Step | Action | Output |
|---|---|---|
| 1 | Screen for complete response and material deviations | Shortlist with open questions |
| 2 | Clarify engineering, scope, testing and local interfaces | Normalized technical comparison |
| 3 | Complete lawful supplier due diligence and evidence checks | Documented risk review |
| 4 | Compare total project exposure and contract terms | Negotiation position |
| 5 | Attach the approved schedules to the order | Traceable award baseline |
06
Distinguish the contracting entity, project coordinator, package manufacturer, control-system provider, local contractor and after-sales route. The proposal should state who owns each engineering decision, manufacture, test, document, site task, warranty response and spare-parts obligation.
| Capability area | Evidence to request | Risk signal |
|---|---|---|
| Requirement response | Clause-by-clause response, assumptions, exceptions and design owner | Generic brochure substituted for the project basis |
| System integration | Equipment and interface schedule, layout, loads, controls and responsibility map | No one owns the boundary between packages |
| Manufacturing and quality | Identified manufacturing source, inspection plan and records appropriate to the scope | Unclear source or unverifiable inspection claims |
| Project delivery | Named communication route, document plan, schedule, FAT and change process | Milestones without dependencies or evidence |
| Lifecycle support | Manuals, backups, training, warranty reporting, parts identification and escalation | Support promise without a usable route or data |
07
A scorecard helps organize review but cannot replace technical, legal, financial and reference due diligence. Record the source and date behind each score, apply mandatory gates before weighted preferences and retain unresolved risks even when one supplier has the highest total.
Use for contracting identity, critical requirement, legal or safety condition, and essential delivery capability.
Use for genuine trade-offs after mandatory conditions are satisfied.
Reduce or withhold a score when only a generic claim, undated sample or unverifiable statement is available.
Record why an unresolved risk is accepted, by whom, with which condition and before which commitment.
Buyer questions
Not from price alone. First normalize scope, performance conditions, services, local work, delivery and risk; then compare total project exposure.
Use a manageable shortlist that can be evaluated against the same requirement set. The quality of clarification matters more than collecting many incomparable quotations.
Check applicable business identity, quoted manufacturing and component evidence, documents, test approach, reference information you can lawfully verify, and the exact contracting entity.
No. It makes evidence and gaps visible. Commercial, legal, financial, technical and destination-country decisions still require responsible review.
No. The score summarizes entered evidence and weights. Mandatory failures, unresolved interfaces, contract terms, local-work exposure and due-diligence findings must remain visible outside the total.
Move this project question forward
The equipment has to reach the site, enter the building and become maintainable operation.
Not sure which data matters? Send what you have and state the decision you need to make.
Send target capacity and SKUs, source-water report, site utility schedule, building layout and required project milestones.
The project desk can identify missing inputs and a practical next step. Final engineering, configuration, compliance and commercial terms remain project-specific.