Shipping and receiving
Packing list, package identity, inspection process, damage reporting and protected storage.
Factory planning for water bottling projects
Machine arrival is a project gate
Installation time is protected when unloading, access, local works, utilities, people and test materials are ready in the agreed sequence.
01
Follow the equipment from transport arrival to its final installed position.
Packing list, package identity, inspection process, damage reporting and protected storage.
Crane or forklift basis, ground condition, competent operators, lifting points and safe exclusion area.
Doors, turns, overhead limits, floor loading, columns and temporary removals.
Approved layout, benchmarks, leveling, foundations, anchors and clearance.
02
Separate work that must finish before positioning from work completed around installed equipment.
Floors, drains, rooms, supports, penetrations, platforms, barriers and finishes.
Generation and main distribution completed, with final connections coordinated to equipment.
Materials, labor, routes, testing, identification and responsibility for each connection.
Local work controls, access, isolation, PPE and required permits managed by responsible site parties.
03
Confirm practical working conditions before travel or site mobilization.
Named project owner, local trades, translator if required, operators and maintenance participants.
Clarify supplier tools, buyer tools, lifting, welding, cables, pipe materials and test instruments.
Approved product and packaging inputs available by the commissioning sequence.
A dated list with owners, impact and the decision on whether work may proceed.
Buyer questions
Commercial and storage factors vary, but readiness should be visible before shipment so delay, damage and extra handling risks can be managed.
The order should list special supplier tools and buyer/local tools, including lifting, welding, electrical and measurement equipment.
Only after mechanical, electrical, utility, safety and material prerequisites for the planned tests are complete.
Turn site facts into a plant brief