Factory planning for water bottling projects
Issue one comparable request to every shortlisted supplier
A useful RFQ gives every supplier the same product, water, package, output, site and service basis and requires a structured response. It separates confirmed requirements, buyer preferences and open questions so proposals can be clarified before price is compared.
Answer first
Use one controlled product, water, bottle, pack, output, site and service basis; request a system-by-system scope, utilities and interfaces, testable performance, documents, FAT and site services, spares, exceptions and a comparable commercial return.

01
Give the document a revision, issue date, response deadline, confidentiality basis, buyer contact, project location and clarification route. Require suppliers to identify every assumption, exception and alternative instead of silently completing missing inputs.
| RFQ field | Buyer input | Supplier response required |
|---|---|---|
| Product and destination | Intended water category, market and applicable local review route | Treatment and labeling assumptions plus information still required |
| Source water | Source status, analysis, temperature and known variation | Proposed process basis, design inputs, recovery and waste streams |
| Containers and packs | Bottle or preform, sizes, cap, label, code and secondary pack | Format range, change parts, samples, limitations and confirmation process |
| Output basis | Saleable demand, shifts, preferred rate and operating assumptions | Rated conditions, balanced rate, efficiency assumptions and exclusions |
| Site and schedule | Country, building status, utilities, access and target gates | Dependencies, buyer inputs, lead items and milestone proposal |
02
Ask for a numbered equipment and service schedule rather than one line labeled complete plant. Each row should state quantity, function, key basis, supplier, inclusion status, options, buyer work and the document that confirms the item.
Pretreatment, treatment, storage, transfer, sanitation, instruments and sampling boundaries.
Purchased-bottle handling or blowing, molds, preform handling, air, cooling and clean transfer.
Rinsing, filling, capping, cap supply, hygiene, format range, controls and drainage.
Inspection, labeling, coding, packing, conveyors, accumulation, pallet and warehouse interfaces.
Utility packages, laboratory needs, spares, tools, documents and identified local work.
03
Require a schedule that names the medium, quantity and quality basis, normal and peak condition, connection point, pipe or cable responsibility, signal interface, drain, room condition and verification method. Generic total load lists are not enough for local design.
| Interface | Supplier must state | Buyer or local team must confirm |
|---|---|---|
| Electrical | Connected and starting loads, voltage basis, panels, cable limits and protection interface | Available service, transformer, distribution, grounding and local code design |
| Air and cooling | Pressure, flow, quality, heat load, connections and operating envelope | Generation, storage, distribution, ventilation and drainage |
| Water and drains | Feed and product-water duties, rinse, cleaning, reject and discharge points | Source, local piping, drains, wastewater route and acceptance |
| Controls and data | Signals, interlocks, network boundary, backups and access requirements | Plant integration, cybersecurity and authorized support route |
04
State the formats, product or test medium, materials, run conditions, duration basis, quality rules, measurement points, instruments, planned stops, reject accounting, data record, deviation process and acceptance authority. Require the supplier to return a proposed FAT and site-test method.
Define saleable output, agreed product and pack, utilities, accumulation, staffing and excluded downtime.
Define fill, closure, package, hygiene and other agreed checks with the responsible release party.
Require raw readings, counters, samples, alarms, photographs where useful, deviations and signed results.
Set ownership, deadline, retest need, shipment effect and the authority that closes each exception.
05
List required languages, formats, review stages and final controlled copies. Separate engineering documents, manufacturing records, operating information, software and backups, spare-parts data, installation services, commissioning, training, warranty reporting and remote support.
| Stage | Required evidence |
|---|---|
| Before approval | Process description, equipment list, layouts, loads, interfaces, formats, schedule and deviations. |
| Before FAT | Approved test plan, manuals draft, spare list, drawings, software list and inspection readiness. |
| Before shipment | FAT disposition, packing list, final shipping data, installation instructions and controlled open actions. |
| At handover | As-built documents, backups, settings, maintenance plan, parts identification, training and acceptance status. |
06
Ask suppliers to return the same pricing structure, currency and trade basis, validity, payment milestones, delivery basis, options, exclusions, taxes or duties assumptions, travel and local cost responsibilities, warranty basis and change process.
| Return schedule | Required status | Comparison rule |
|---|---|---|
| Base scope | Included and priced | Must match the controlled equipment and service schedule |
| Options | Separately described and priced | Do not hide required functions as unpriced options |
| Buyer / local scope | Named with interface and due date | Price the local work outside the machinery total |
| Exceptions | Numbered technical or commercial deviation | Clarify before treating the proposal as compliant |
| Assumptions | Visible basis and consequence if changed | Do not compare totals built on different assumptions |
R
These primary sources support risk-based planning and controlled project review. They do not provide a project price, approve a site or replace current requirements and qualified local decisions.
Buyer questions
Use the RFQ template before proposals are issued so every supplier answers the same requirement. Use the quotation checklist after proposals arrive to identify omissions, differences, options and buyer-side work.
No. Mark information as confirmed, preferred or to be confirmed and state who will close it. Do not invent source, site, format or regulatory data simply to complete a form.
Yes, when the response clearly states the departure, reason, technical and commercial effect, evidence, interfaces and any change to acceptance. Keep the requested compliant basis visible for comparison.
Attach available water analysis, bottle and pack references, demand basis, site survey, utility information, scope matrix, local requirements and requested schedule. Identify missing files as open actions.
Move this project question forward
Require a schedule that names the medium, quantity and quality basis, normal and peak condition, connection point, pipe or cable responsibility, signal interface, drain, room condition and verification method. Generic total load lists are not enough for local design.
Not sure which data matters? Send what you have and state the decision you need to make.
Send target capacity and SKUs, source-water report, site utility schedule, building layout and required project milestones.
The project desk can identify missing inputs and a practical next step. Final engineering, configuration, compliance and commercial terms remain project-specific.