Separate screening from simulation
An early screening test can compare designs, while a distribution simulation aims to represent a defined route. Record what the selected test can and cannot establish.
Factory planning for water bottling projects
Plant buying and operating worksheets
Treat the bottle, secondary pack, pallet, layer pattern and wrapping as one load system. A pallet that looks stable at the wrapping station still needs evidence for the way it is stored, moved and transported.
Answer first
Define the complete load specification and distribution route, then choose tests that represent the relevant handling and transport hazards. Set acceptance criteria before testing, retain the actual configuration and results, and compare laboratory findings with real shipment performance.

01
A change to bottle mass, pack film, pallet quality or layer pattern can change performance even if the total number of bottles stays the same.
| Part of the load | Specification to retain |
|---|---|
| Bottle and pack | Bottle drawing, fill condition, closure, bottles per pack and secondary packaging |
| Pallet | Dimensions, construction, condition and approved handling arrangement |
| Pattern | Packs per layer, orientation, layers, overhang and interlayers |
| Wrapping | Film identity, machine recipe and measured application characteristics |
| Finished load | Height, gross mass, identification and photographs |
| Environment | Storage time, stacking arrangement, temperature/humidity and route conditions |
02
Illustration only: a load has 12 bottles per pack, 10 packs per layer and 5 layers. The 0.5 L fill and water density of 1 kg/L are screening assumptions for this example.
| Measure | Calculation | Result |
|---|---|---|
| Packs | 10 × 5 | 50 packs |
| Bottles | 50 × 12 | 600 bottles |
| Water mass | 600 × 0.5 L × 1 kg/L | 300 kg |
| Illustrative gross mass | 300 kg water + 16 kg packaging + 24 kg pallet | 340 kg |
| Final specification | Use measured actual mass and dimensions | Not the illustrative assumptions |
03
Describe whether loads stay intact or are broken down, how they are stacked, the transport mode and the handling stages. The test laboratory should select the appropriate current protocol with the buyer and packaging team. This guide does not specify universal vibration, braking or compression limits.
An early screening test can compare designs, while a distribution simulation aims to represent a defined route. Record what the selected test can and cannot establish.
Moisture, temperature and storage can affect packaging behavior. Use conditions justified by the actual materials and distribution requirements.
Specify permitted movement, pack damage, leaks, bottle deformation, label damage and identification readability before the test. Do not choose the criteria after seeing the result.
04
Record the tested bill of materials and settings, sample identities, procedure revision, observations, photographs, deviations and disposition. An attractive final photograph does not replace the test record.
Locate whether movement began at the pallet, an interlayer, pack deformation or wrap behavior. Change one factor where feasible so the result can explain the improvement.
Identify which receiving and production checks keep actual loads within the qualified configuration. Record approved tolerances in the packaging specification.
Review bottle lightweighting, new film, changed packs, pallet supply, load height, route or storage. Compare actual shipment damage with the assumptions used during qualification.
R
The references support the underlying method. The bottling examples and worksheet structures are independently authored planning aids; project requirements determine the final design and acceptance criteria.
Connects test selection to package format, actual handling and distribution hazards. Obtain the applicable procedure for execution.
Buyer questions
No. Review the complete load, film application, package compression and handling requirements. Excess force can create damage as well as restraint.
Not by itself. Select verification for the actual transport and handling hazards and retain the limits of the evidence.
No. The result applies to the tested configuration and conditions. Control production variation and review real distribution performance.
Move this project question forward
A stable static pallet can lean, collapse or shed cases after vibration, braking, humidity or repeated handling.
Not sure which data matters? Send what you have and state the decision you need to make.
Send bottle material and sizes, preform or container drawings, cap and label specifications, SKU mix and changeover needs.
The project desk can identify missing inputs and a practical next step. Final engineering, configuration, compliance and commercial terms remain project-specific.