A - Raw water and treatment
Raw-water receipt, treatment modules, treated-water storage, testing access and hygienic transfer.
Factory planning for water bottling projects
Zone the functions before fixing the floor plan
Functional zoning helps a project team discuss hygiene, movement, services, access and storage without pretending an early sketch is a construction drawing.
01
Keep the core production functions visible and connect them through defined interfaces.
Raw-water receipt, treatment modules, treated-water storage, testing access and hygienic transfer.
Preform and bottle storage, blowing where selected, bottle handling and clean transfer to filling.
Rinsing, filling, capping, controlled access, cap supply, drainage, cleaning and maintenance clearance.
Label and code application, secondary packing, accumulation, rejected-pack handling and material replenishment.
Electrical, compressed air, high-pressure air, chilled water and other agreed services with maintenance access.
02
A factory also needs spaces that support production before and after the machines run.
Preforms or bottles, caps, labels, film, cartons and other approved materials with practical replenishment paths.
Pack receipt, pallet flow, inventory staging and loading access based on the distribution plan.
Sampling, records and the testing functions required by the product and local compliance plan.
Tools, safe parts storage, work access and controlled handling of lubricants and consumables.
Vehicle access, unloading, equipment arrival route and finished-goods dispatch movement.
03
Required area depends on the confirmed line, storage strategy, utility rooms, clearance and expansion plan.
Length, width, clear height, columns, doors, pits, mezzanines and floor conditions.
People, forklifts, materials, waste, finished goods and maintenance routes.
Power, air, water, drainage and other connection routes plus access for maintenance.
Reserved directions, tie-in points and warehouse effects of later expansion.
Buyer questions
There is no responsible single answer from BPH alone. Area depends on the complete configuration, warehouse policy, utilities, access, clearance and future expansion.
The appropriate separation depends on product, process, local rules and the agreed hygiene concept. Confirm it during project and local design review.
No. It is an illustrative planning tool for collecting inputs and identifying interfaces.
Turn site facts into a plant brief