sales@allottech.com
Direct company contact
Contact the Water Bottling Plant Project Desk
Use the structured brief when possible, or contact Allot Tech directly for a traceable project discussion.
01
Business contacts
The website directs project inquiries to the company sales channel.
China phone
+86 186 6213 1120
US phone
+1 818 262 0958
Corporate website
allottech.com
02
Company
Allot Tech (Suzhou) Co., Ltd.
Business address
3rd Floor, Building 14, No. 71 Guomao Lane, Zhangjiagang, Suzhou, Jiangsu, China.
Project role
China-based beverage-equipment project clarification and coordination.
Best first message
Product, container, target output, site status, required scope, destination and schedule.
Project boundary
Final equipment, performance, price, delivery and services follow the signed quotation and technical agreement.
03
Prepare a message the project desk can route
A short, structured message helps separate an early factory question from an equipment RFQ, site-readiness review or service discussion.
Identify the project stage
Say whether the project is an early concept, a selected site, active procurement, installation preparation or an existing-plant expansion.
Name the product and container
Share the water type, bottle material and volume, cap, label and finished pack if these decisions are already available.
Describe the site
Include land or building status, available dimensions, destination and the utilities or access constraints already known.
State the requested next step
Ask for a plant-brief review, responsibility discussion, equipment scope, site-input list or another clearly defined response.
Buyer questions
Questions to settle before the next project gate
Which email should I use for an RFQ?
Use sales@allottech.com.
Can I call from the United States?
Yes. The listed US contact number is +1 818 262 0958.
What information gets a more useful reply?
Include product, bottle, target output, factory status, scope, country and schedule. The plant brief organizes these inputs.
Turn site facts into a plant brief