Factory planning for water bottling projects

sales@allottech.comUS +1 818 262 0958China +86 186 6213 1120

Machine arrival is a project gate

Prepare the Site Before Water Bottling Equipment Arrives

Installation time is protected when unloading, access, local works, utilities, people and test materials are ready in the agreed sequence.

01

Plan receiving and positioning

Follow the equipment from transport arrival to its final installed position.

Shipping and receiving

Packing list, package identity, inspection process, damage reporting and protected storage.

Unloading

Crane or forklift basis, ground condition, competent operators, lifting points and safe exclusion area.

Access route

Doors, turns, overhead limits, floor loading, columns and temporary removals.

Positioning

Approved layout, benchmarks, leveling, foundations, anchors and clearance.

02

Complete local work in the right sequence

Separate work that must finish before positioning from work completed around installed equipment.

Civil and building

Floors, drains, rooms, supports, penetrations, platforms, barriers and finishes.

Utilities

Generation and main distribution completed, with final connections coordinated to equipment.

Piping and electrical

Materials, labor, routes, testing, identification and responsibility for each connection.

Safety and permits

Local work controls, access, isolation, PPE and required permits managed by responsible site parties.

03

Release the installation team against evidence

Confirm practical working conditions before travel or site mobilization.

People

Named project owner, local trades, translator if required, operators and maintenance participants.

Tools and consumables

Clarify supplier tools, buyer tools, lifting, welding, cables, pipe materials and test instruments.

Materials for tests

Approved product and packaging inputs available by the commissioning sequence.

Open actions

A dated list with owners, impact and the decision on whether work may proceed.

Buyer questions

Questions to settle before the next project gate

Should equipment ship before the site is ready?

Commercial and storage factors vary, but readiness should be visible before shipment so delay, damage and extra handling risks can be managed.

Who supplies installation tools?

The order should list special supplier tools and buyer/local tools, including lifting, welding, electrical and measurement equipment.

Can commissioning start immediately after positioning?

Only after mechanical, electrical, utility, safety and material prerequisites for the planned tests are complete.

Turn site facts into a plant brief

Plan the factory around the equipment — before responsibilities become gaps.